Service 06 | Operating mines
Operations Optimization
Lower unit costs. Steadier production.
Unit-cost benchmarking by activity, time-usage models for fleets and plants, and plan-versus-actual reconciliation. The output is a short list of improvements ranked by value and ease, not a hundred-page report.
Diagnostics
Drill-and-blast design and fragmentation, load-and-haul cycle improvement, dispatch and short-interval control, grade control and ore-loss and dilution programs that your crews can keep running after we leave.
Mine productivity
Throughput and recovery improvement, reliability-centred maintenance strategy, shutdown planning, and interim technical managers, chief geologists or planning engineers with a defined handover to your permanent staff.